Türkiye’s Soil Pollution Regulation: Key Obligations for Operators

5 min read BCA Group

Türkiye’s Regulation on the Control of Soil Pollution and Point-Source Contaminated Sites was published in Official Gazette No. 27605 on 8 June 2010. Only some articles took effect at first; after several postponements the Regulation came fully into force on 8 June 2015. Since then it has created concrete obligations for operators of potentially soil-polluting activities, and it matters to anyone buying, financing or closing an industrial site in Türkiye.

What the Regulation aims to do

  • Prevent and clean up soil pollution as part of sustainable soil management,
  • Apply a risk-based approach, weighing the benefits of remediation to reach sustainable solutions,
  • Register contaminated sites and polluting facilities, keep the data current and develop appropriate strategies.

Who is in scope?

An annex to the Regulation lists potentially soil-polluting activities by NACE code. Fuel stations, fuel storage terminals, refineries, chemical, metal and fertiliser production, mining and waste facilities are among the most common. If your facility’s NACE code is on the list, the Regulation applies.

How the process works

  1. Preliminary Activity Information Form: operators in scope notify the Ministry about their facility through its online system.
  2. Sampling and Analysis Plan: where the Ministry requires it, the locations, depths and parameters for sampling are planned.
  3. Site Status and Risk Assessment Reports: soil and groundwater samples are analysed by accredited laboratories and screened against the Regulation’s generic limit values, with a site-specific risk assessment where needed.
  4. Remediation and monitoring: if contamination poses an unacceptable risk, a remediation action plan is prepared and implemented, and results are documented through verification sampling.

This work is carried out by organisations holding a certificate of competence from the Ministry, under a Communiqué published on 17 June 2011.

Practical advice for operators and investors

  • Start early: investigations launched close to a closure, transfer or financing deadline compress schedules. Sites with baseline data move through these processes far faster.
  • One team, one dataset: using the same site data for Ministry reporting, lender requirements (IFC, EBRD) and acquisition due diligence reduces cost.
  • Keep records: information on historical uses, storage tanks and past spills is the foundation of a Phase I desk study.

How BCA Group can help

Our Ministry-certified team manages the whole process as a single point of contact, from the preliminary information form through site investigation, risk assessment, remediation and verification, with reporting in English and Turkish.

This article is for general information only. Always refer to the current text of the regulation published in the Official Gazette.